Subject
Southeastern
London Travel News has published 6 stories involving Southeastern, from August 2026 to August 2026. Each one is scored for how well the original reporting stood up, and lists the reports it was written from.
- Strikes & Disruption · London
Mill Hill East Tube station closed after police incident
Mill Hill East Underground station was closed on 14 October 2024 after police were called to reports of a person with a knife. All Southeastern trains are passing through without stopping. No injuries have been confirmed, and the station will remain shut until officers complete their search.
London4 min readTrust 30 · Craft 45 · Hype 75
Tube & Rail · South LondonSoutheastern trains halted after West Wickham trespass incident
Southeastern suspended all train services through West Wickham station on 16 August 2026 after a trespass incident on the tracks. Delays affected commuters travelling between Bromley South and Hayes, with no injuries reported. British Transport Police confirmed the investigation is ongoing.
South London4 min readTrust 30 · Craft 43 · Hype 30
Tube & Rail · Central LondonCharing Cross and Waterloo East reopen after three-week track upgrade
Charing Cross and Waterloo East stations in central London reopened on 17 August after a three-week closure for engineering works. Network Rail installed new track and switches to address faults causing over 21,000 minutes of delays. A final closure is scheduled for 23 August for checks.
Central London4 min readTrust 54 · Craft 85 · Hype 15
Tube & Rail · South LondonSoutheastern diverts Charing Cross trains to Victoria on 8 August
Southeastern will divert trains from London Charing Cross to Victoria on 8 August while engineering works block lines between Lewisham and Orpington. Hither Green, Grove Park and five other stations will close, with buses replacing trains between Lewisham and Orpington, and Greenwich and Sidcup.
South London4 min readTrust 44 · Craft 62 · Hype 15
Tube & Rail · Central LondonCharing Cross station closed for 22 days of track and platform repairs
Charing Cross station is closed until 17 August for a 22-day engineering programme. Network Rail is replacing all track between the station and Waterloo East, repairing platforms and upgrading junctions to reduce future delays. The work avoids four 9-day closures or two years of weekend shutdowns.
Central London5 min readTrust 68 · Craft 81 · Hype 10- World
Southeastern cancels trains and runs buses for engineering work 3-7 August
Southeastern will cancel, divert or replace trains with buses from 3 to 7 August for engineering work. Replacement buses will run between Maidstone East and Ashford, Bromley South and Victoria, and Gillingham and Faversham. London Victoria to Orpington trains will skip stops after midnight.
5 min readTrust 42 · Craft 55 · Hype 35