Subject
Stuart Harvey
London Travel News has published 6 stories involving Stuart Harvey, from August 2026 to September 2026. Each one is scored for how well the original reporting stood up, and lists the reports it was written from.
- World
Gallows Corner reopens after 15 months of roadworks
Gallows Corner has fully reopened to traffic following a 15-month closure. The major roadworks project, which involved replacing an ageing flyover and diverting a water main, has now been completed by Transport for London.
3 min readTrust 30 · Craft 50 · Hype 40
Roads & Driving · North LondonBrent Cross Flyover works begin September 30 with overnight A406 closure
Essential renewal works on the Brent Cross Flyover will commence on the night of September 30, involving overnight closures of the A406 North Circular. The two-year project aims to strengthen the structure and improve safety.
North London3 min readTrust 60 · Craft 65 · Hype 40
Tube & Rail · LondonDLR introduces new trains after safety recall and delays
The first of 54 new trains for the Docklands Light Railway (DLR) are being introduced to London's transport network. The fleet faced delays and a safety recall, with Transport for London apologising for the disruption.
London2 min readTrust 44 · Craft 61 · Hype 20
Tube & Rail · StratfordNew DLR trains return to Stratford to Woolwich route
New Docklands Light Railway trains, first introduced in October 2025, are being gradually returned to service after being removed due to braking problems in wet weather. The initial route for their reintroduction is Stratford International to Woolwich Arsenal.
Stratford2 min readTrust 30 · Craft 60 · Hype 20
Tube & Rail · All LondonFirst new DLR train returns to service after modifications
The first of 54 new Docklands Light Railway trains has returned to passenger service after modifications addressed a performance issue. The trains were withdrawn in September 2025 due to problems during low-adhesion conditions.
All London3 min readTrust 44 · Craft 61 · Hype 20
Roads & Driving · North LondonA41 Brent Cross Flyover closes to one lane from 24 September for two-year repair
Work to strengthen the Brent Cross Flyover begins on 24 September 2026, reducing the A41 to one lane each way for two years. The £10.8m scheme will remove the 7.5-tonne weight restriction but cause delays on the North Circular and surrounding routes.
North London5 min readTrust 64 · Craft 80 · Hype 25