Roads & Driving
2/4
/Roads & Driving/ Westminster//3 min read
London Travel News reportRoads & DrivingWestminsterFile OXFORD-S

Oxford Street section to be pedestrianised from October 2026

A trial scheme will remove buses and cyclists from a 0.9km stretch, with permanent changes expected by late 2027.

Trust 30Craft 55Hype 45How this was reported ▾
Trust30/100

The central claim is attributed to TfL via a tweet, but no named individuals or other sources are cited.

How well corroborated and evidenced the reporting is. Higher is better.

Craft55/100

The article explains what the changes mean for residents and names specific streets and dates.

Context, balance and separation of fact from comment. Higher is better.

Hype45/100

The headline promises a definitive pedestrianisation, but the article clarifies it's a trial scheme.

How far presentation runs ahead of substance. Lower is better.

1 source assessed · methodology

NewsroomLTN
Newsroom signatureLondon Travel DeskOperator data, editor-supervised
Filed London TravelStatus checked against the operator
Pass this story on
Oxford Street section to be pedestrianised from October 2026
HNL visual fileWestminster

A 0.9km section of Oxford Street in Westminster, stretching from Orchard Street to Great Portland Street, will be closed to most traffic from Monday, October 26, 2026. This change marks the beginning of a permanent scheme to make the busy shopping street car-free, a concept that has been discussed for decades. The initial phase will operate as a live trial, known as the 'transition scheme', allowing for feedback before permanent infrastructure is introduced.

Trial Scheme Details

Read Next in London Travel News2 min read
Oxford Street pedestrianisation starts 26 October

Oxford Street pedestrianisation starts 26 October

Buses, taxis, and bikes will be banned from a nearly one-kilometre section of the street.

The transition scheme, which received final approval in February 2026, will see all traffic, including buses and private vehicles, diverted from the evening of Sunday, October 25, 2026. Buses on routes including 7, 94, 98, 139, and 390, along with their night services, will be rerouted. Cyclists will also be prohibited from riding through the pedestrianised zone and will be directed to alternative nearby roads such as Wigmore Street and Henrietta Place. Emergency services will retain access, and street cleaning and waste collection will be permitted at specified times.

Future Plans

Following the trial period, Transport for London (TfL) will assess the impact of the changes on shoppers, businesses, and transport networks. Permanent infrastructure for the pedestrianised area is anticipated to be introduced towards the end of 2027. The section of Oxford Street affected includes the busy junction at Oxford Circus.

Related Borough Coverage3 min read
Brent Cross Flyover Lane Reductions Begin Tuesday

Brent Cross Flyover Lane Reductions Begin Tuesday

Transport for London begins first phase of interchange renewal, affecting A41 traffic.

Questions this report answers

+When will Oxford Street be pedestrianised?

A section of Oxford Street between Orchard Street and Great Portland Street will be pedestrianised from Monday, October 26, 2026. This initial phase will operate as a trial scheme, with permanent infrastructure expected by late 2027.

+Will buses still run on Oxford Street?

No, buses will be removed from the pedestrianised section of Oxford Street. Affected routes will be diverted onto alternative roads as part of the transition scheme.

+Can cyclists ride through the pedestrianised part of Oxford Street?

Cyclists will not be permitted to ride through the pedestrianised section of Oxford Street. They will be redirected to nearby streets as part of the new traffic management plan.

+What is the 'transition scheme' for Oxford Street?

The 'transition scheme' is the initial trial phase of Oxford Street's pedestrianisation, starting on October 26, 2026. It allows for feedback from the public and businesses before permanent infrastructure is installed by late 2027.

On the recordHOW
WE FILE

No invented reporter. No hidden source trail.

The London Travel Desk assembled this report from the outlets listed below. Language-model drafting is reviewed under human editorial supervision, with scoring notes and corrections kept visible.

More Coverage in Roads & Driving

Oxford Street pedestrianisation starts 26 October

Oxford Street pedestrianisation starts 26 October

Westminster | 2 min read
Brent Cross Flyover Lane Reductions Begin Tuesday

Brent Cross Flyover Lane Reductions Begin Tuesday

North London | 3 min read
A2 Route Through South East London Detailed

A2 Route Through South East London Detailed

East London | 3 min read
Driver arrested after car overturns at Acton level crossing

Driver arrested after car overturns at Acton level crossing

London | 1 min read

Who else reported this

Our article above is written from the facts in these reports. Read the originals — every one is linked.

Oxford Street Westminster pedestrianisation | London Travel News