Tube & Rail
2/4
/Tube & Rail/ East London//2 min read
London Travel News reportTube & RailEast LondonFile C2C-TRAI

c2c trains: Engineering work disrupts East London lines

Engineering works between Stanford-le-Hope and Pitsea will last until Thursday, with further alterations planned for Sunday.

Trust 30Craft 53Hype 41How this was reported ▾
Trust30/100

The central claim is attributed to c2c, but no named individuals or independent sources are cited.

How well corroborated and evidenced the reporting is. Higher is better.

Craft53/100

The article clearly separates facts from comment and provides specific details, but lacks quotes from affected parties or a right of reply.

Context, balance and separation of fact from comment. Higher is better.

Hype41/100

The headline uses mild emphasis, and the article's content is proportionate to the presentation.

How far presentation runs ahead of substance. Lower is better.

1 source assessed · methodology

NewsroomLTN
Newsroom signatureLondon Travel DeskOperator data, editor-supervised
Filed London TravelStatus checked against the operator
Pass this story on
c2c trains: Engineering work disrupts East London lines
HNL visual fileEast London

c2c train services are facing evening disruptions this week as engineering work takes place between Stanford-le-Hope and Pitsea. This work began on Monday, September 21, and is scheduled to conclude on Thursday, September 24. During this period, trains will start or terminate at Stanford-le-Hope, with rail replacement buses operating between Stanford-le-Hope and Pitsea.

The final service from Fenchurch Street to Shoeburyness will depart at 9.11pm. Similarly, the last train departing from Southend Central to Fenchurch Street will leave at 9.28pm.

Read Next in London Travel News3 min read
c2c trains face disruption in early November

c2c trains face disruption in early November

Engineering works will affect multiple lines across East London and Essex from November 2 to November 5 and on the weekend of November 7-8.

Sunday engineering works

Further significant disruption is scheduled for Sunday, September 27, when engineering work will be carried out between Fenchurch Street and Barking. This will affect all three of c2c's lines: the Basildon, Ockendon, and Rainham lines.

Trains on the Basildon line will be diverted to Liverpool Street, making calls at Stratford but bypassing Limehouse and West Ham. Services on the Rainham line will also be diverted to Liverpool Street, calling at Stratford and not stopping at Limehouse or West Ham. These Rainham line services will be extended to Shoeburyness.

Related Borough Coverage4 min read
Harold Wood station assault leaves woman injured, police seek suspect

Harold Wood station assault leaves woman injured, police seek suspect

The attack occurred on 9 October at 9.15 pm on a platform and later outside the station, and British Transport Police are asking the public to identify the attacker.

Ockendon line services will operate as shuttles running between Upminster and Grays. Passengers travelling on these services will need to change at either Upminster or Grays for onward journeys towards London or Southend.

c2c has stated that tickets will be accepted at no extra cost on alternative TfL services. These include the District line between Tower Hill, West Ham, and Barking; the Jubilee line between Stratford and West Ham; and the DLR between Tower Gateway, Limehouse, West Ham, and Stratford.

Passengers are advised to check their specific journey details before travelling, as service times and routes may be subject to further changes.

Questions this report answers

+When is the engineering work taking place?

Engineering work between Stanford-le-Hope and Pitsea began on September 21 and will last until September 24. Further engineering work between Fenchurch Street and Barking will take place on Sunday, September 27.

+How will my journey be affected on Sunday?

On Sunday, September 27, Basildon and Rainham line trains will be diverted to Liverpool Street, calling at Stratford. Ockendon line services will run as shuttles between Upminster and Grays. Passengers should check specific journey details.

+What is the last train from Fenchurch Street this week?

The last train from Fenchurch Street to Shoeburyness will be the 9.11pm service. This applies during the period of engineering works affecting services this week.

On the recordHOW
WE FILE

No invented reporter. No hidden source trail.

The London Travel Desk assembled this report from the outlets listed below. Language-model drafting is reviewed under human editorial supervision, with scoring notes and corrections kept visible.

More Coverage in Tube & Rail

c2c trains face disruption in early November

c2c trains face disruption in early November

East London | 3 min read
Harold Wood station assault leaves woman injured, police seek suspect

Harold Wood station assault leaves woman injured, police seek suspect

East London | 4 min read
MPs demand meeting over "unacceptable" c2c rail services

MPs demand meeting over "unacceptable" c2c rail services

London | 3 min read
Angel Tube Station To Become Exit-Only On Weekends

Angel Tube Station To Become Exit-Only On Weekends

London | 2 min read

Who else reported this

Our article above is written from the facts in these reports. Read the originals — every one is linked.

c2c trains disrupted between Stanford-le-Hope and Pitsea | London Travel News