Tube & Rail
2/4
/Tube & Rail/ London//5 min read
London Travel News reportTube & RailLondonFile AECOM-TO

AECOM to study Bakerloo line depot changes for new 1972-era train replacement

Feasibility work at Stonebridge Park, Queen’s Park and Elephant & Castle will shape infrastructure for a future fleet

Trust 50Craft 95Hype 15How this was reported ▾
Trust50/100

Only one named source and no document citation, giving a trust score of 50.

How well corroborated and evidenced the reporting is. Higher is better.

Craft95/100

Provides context, quotes a responsible official, and outlines next steps, earning a high critic score.

Context, balance and separation of fact from comment. Higher is better.

Hype15/100

Language is measured with no sensationalism, resulting in low hype.

How far presentation runs ahead of substance. Lower is better.

1 source assessed · methodology

NewsroomLTN
Newsroom signatureLondon Travel DeskOperator data, editor-supervised
Filed London TravelStatus checked against the operator
Pass this story on
AECOM to study Bakerloo line depot changes for new 1972-era train replacement
HNL visual fileLondon

Transport for London has hired engineering consultancy AECOM to assess what changes are needed at depots and sidings before new Bakerloo line trains can be introduced. The current fleet, which entered service in 1972, is the oldest in daily use on the UK rail network.

The feasibility study will focus on three locations: Stonebridge Park Depot in Brent, the Queen’s Park area, and the London Road sidings at Elephant & Castle in Southwark. AECOM will produce an initial coordinated design, environmental assessments and railway engineering plans for each site.

Read Next in London Travel News4 min read
A.A.D. Lang’s wooden Tube wheels trialled in 1930 but never adopted

A.A.D. Lang’s wooden Tube wheels trialled in 1930 but never adopted

Barnet-based inventor’s laminated spruce wheels passed military tests yet vanished from Underground records

What the study will cover

At Queen’s Park, Transport for London wants to add reversing capability and new stabling tracks. This would require realigning National Rail tracks and demolishing the existing North Shed. The work could affect residents in the streets immediately north of the station, including Albert Road and Salusbury Road.

Stonebridge Park Depot would need a full rebuild of its main building. Transport for London also plans to acquire land to the north-west of the depot for additional stabling tracks. The depot sits between North Circular Road and the Grand Union Canal in the Stonebridge neighbourhood.

Related Borough Coverage4 min read
Euston Station Toilets Ranked Worst in London After 63% Negative Reviews

Euston Station Toilets Ranked Worst in London After 63% Negative Reviews

TripAdvisor study finds paying to use facilities drives most complaints at major UK railway stations

At Elephant & Castle, the London Road sidings would be modified to support the new fleet. The sidings are located south of the station, adjacent to the railway viaduct that carries Thameslink services.

Timeline and next steps

The feasibility study is expected to take several months. Once complete, Transport for London will use the findings to prepare planning applications and detailed engineering designs. No date has been set for the new trains to enter service, and no funding has been confirmed for the wider upgrade programme.

AECOM’s Rail Director for London and the South East, Shadi Shekarrizi, said the appointment marked “a significant milestone” for the programme. He told ianVisits that the company would develop “future-ready solutions for depots and sidings that are essential to enabling new rolling stock and improving long-term performance on the line”.

This is a significant milestone for the programme. We will use our planning, engineering and digital expertise to develop future-ready solutions for depots and sidings that are essential to enabling new rolling stock and improving long-term performance on the line.

Shadi Shekarrizi, AECOM Rail Director for London and the South East

How residents can respond

Transport for London has not announced public consultation dates for the depot changes. Residents who want to be notified when consultation opens can register for updates on the TfL website under the Bakerloo Line Upgrade programme. Formal planning applications will be submitted to Brent Council and Southwark Council once the feasibility study is complete.

AECOM has previous experience on the Bakerloo line. The firm was selected alongside WW+P Architects to design four new stations for the proposed Bakerloo Line Extension into south-east London. It was also appointed as lead designer for the first stage of the Elephant & Castle Station Capacity Upgrade in 2023.

Questions this report answers

+Why does the Bakerloo line need new trains?

The current Bakerloo line trains were introduced in 1972 and are the oldest passenger trains still in daily service on the UK rail network. Transport for London says new trains are needed to improve reliability and performance for passengers.

+Which sites will be affected by the depot changes?

The feasibility study covers three locations: Stonebridge Park Depot in Brent, the Queen’s Park area, and the London Road sidings at Elephant & Castle in Southwark. Changes could include track realignments and building demolitions.

+When will the new Bakerloo line trains start running?

No date has been set for the new trains to enter service. The feasibility study is an early step, and funding for the wider upgrade programme has not been confirmed by Transport for London.

+How can residents have their say on the proposals?

Transport for London has not yet announced public consultation dates. Residents can register for updates on the TfL website under the Bakerloo Line Upgrade programme to be notified when consultation opens.

On the recordHOW
WE FILE

No invented reporter. No hidden source trail.

The London Travel Desk assembled this report from the outlets listed below. Language-model drafting is reviewed under human editorial supervision, with scoring notes and corrections kept visible.

More Coverage in Tube & Rail

A.A.D. Lang’s wooden Tube wheels trialled in 1930 but never adopted

A.A.D. Lang’s wooden Tube wheels trialled in 1930 but never adopted

London | 4 min read
Euston Station Toilets Ranked Worst in London After 63% Negative Reviews

Euston Station Toilets Ranked Worst in London After 63% Negative Reviews

London | 4 min read
5.46pm Euston to Crewe train carries 170% capacity despite extra seats

5.46pm Euston to Crewe train carries 170% capacity despite extra seats

London | 5 min read
South Western Railway cuts fare evasion at Waterloo after barcode misuse surge

South Western Railway cuts fare evasion at Waterloo after barcode misuse surge

London | 5 min read

Who else reported this

Our article above is written from the facts in these reports. Read the originals — every one is linked.

AECOM study begins on Bakerloo line depot upgrades | London Travel News