Topic
GBRAnglia
2 stories, newest first.
- Tube & Rail · London
GBR Anglia hails tech for preventing 15 major rail disruptions
GBR Anglia has reported the successful deployment of an on-board monitoring system, Pandas-V, which uses cameras and sensors to detect overhead line faults. The technology has prevented 15 instances of major disruption since November 2025 and is set for wider installation.
London4 min readTrust 60 · Craft 65 · Hype 20 - Tube & Rail · London
Specialist train inspects overhead lines for c2c, London Overground
A specialist train equipped with advanced monitoring technology has inspected overhead electrical lines on c2c and London Overground's Mildmay line. The PANDAS-V system aims to detect faults before they cause significant passenger delays.
London3 min readTrust 44 · Craft 67 · Hype 20