Projects
2/4
/Projects/ London//2 min read
London Travel News reportProjectsLondonFile CITY-OF-

City of London Pedway Reopens After Years of Closure

A section of the raised pedestrian walkway network near Moorgate station is now accessible following redevelopment.

Trust 30Craft 60Hype 45How this was reported ▾
Trust30/100

The central claim is attributed to the author's observation rather than an official source.

How well corroborated and evidenced the reporting is. Higher is better.

Craft60/100

The article clearly separates fact from opinion and describes specific details of the staircase.

Context, balance and separation of fact from comment. Higher is better.

Hype45/100

The article suggests the staircase will be an 'instagram fashion shoot photo opportunity' without strong evidence.

How far presentation runs ahead of substance. Lower is better.

1 source assessed · methodology

NewsroomLTN
Newsroom signatureLondon Travel DeskOperator data, editor-supervised
Filed London TravelStatus checked against the operator
Pass this story on
City of London Pedway Reopens After Years of Closure
HNL visual fileLondon

A portion of the City of London's pedway network has reopened to the public after being inaccessible for several years. The Bassishaw Highwalk section, which spans the London Wall road near Moorgate station, is now open following a period of redevelopment.

Revamped Pedestrian Access

Read Next in London Travel News3 min read
City of London to get 300-metre skyscraper next to Gherkin

City of London to get 300-metre skyscraper next to Gherkin

New York insurer AmTrust plans 70-storey tower, aiming for completion by 2033.

The pedway system was originally conceived as a network of raised pedestrian walkways designed to separate foot traffic from the roads below. While the concept faced challenges and never fully materialised as planned, sections have been progressively revitalised in recent years, offering improved pedestrian routes compared to their earlier iterations.

The recently reopened Bassishaw Highwalk area now includes a new Corten steel footbridge. This structure leads to the highwalk itself, where a pocket park has been redesigned, replacing the previous 2012 layout. A notable addition is a new staircase that encircles the lift, distinguished by its bright yellow cladding.

This section of the pedway had previously closed a few years after its 2018 rebuilding to accommodate further office redevelopment. Its reopening marks the completion of this latest phase of work.

Related Borough Coverage3 min read
Monument Junction Redesign: TfL Consults on Safer Crossings and Cycle Lanes

Monument Junction Redesign: TfL Consults on Safer Crossings and Cycle Lanes

Proposals aim to improve safety for pedestrians and cyclists at the busy City of London junction.

Questions this report answers

+What has reopened in the City of London?

A section of the City of London's pedway network, specifically the Bassishaw Highwalk, has reopened. This elevated walkway near London Wall and Moorgate station had been closed for several years due to redevelopment.

+What are the new features at the Bassishaw Highwalk?

The reopened Bassishaw Highwalk now features a Corten steel footbridge and a revamped pocket park. Additionally, a new staircase with bright yellow cladding has been installed, wrapping around the area's lift.

+What was the original purpose of the pedway network?

The pedway network was planned as a system of raised pedestrian walkways intended to allow people to travel around the City of London without using the roads at street level, born from a desire to separate pedestrians from increasing motor traffic.

On the recordHOW
WE FILE

No invented reporter. No hidden source trail.

The London Travel Desk assembled this report from the outlets listed below. Language-model drafting is reviewed under human editorial supervision, with scoring notes and corrections kept visible.

More Coverage in Projects

City of London to get 300-metre skyscraper next to Gherkin

City of London to get 300-metre skyscraper next to Gherkin

London | 3 min read
Monument Junction Redesign: TfL Consults on Safer Crossings and Cycle Lanes

Monument Junction Redesign: TfL Consults on Safer Crossings and Cycle Lanes

London | 3 min read
Islington Tunnel structural assessment uses muon imaging

Islington Tunnel structural assessment uses muon imaging

North London | 3 min read
York Hall closure costs £924,000 amid Legionella fears

York Hall closure costs £924,000 amid Legionella fears

East London | 2 min read

Who else reported this

Our article above is written from the facts in these reports. Read the originals — every one is linked.

Bassishaw Highwalk reopens | London Travel News